__________________________________________________________________________
Bactrox Operations Manual 16
Day two – remove beaker in the chamber and replace with the second beaker of Anatox
(also new).
Day three – reactivate the first beaker of Anatox by heating at 160C for 2 hours. Then
replace the beaker in the chamber with this reactivated beaker.
Day four – six months – continue switching the reactivated beakers daily until six
months is complete, then discard the old Anatox and repeat the procedure again.
16. ACCESSORIES
Switches and monitors dual gas tank supply. Provides
automatic switch-over to second gas tank alarm
sounds when both tanks are empty. Tanks can be
switched manually at any time.
Provides work bench to support Bactrox chambers.
Chamber Stand height 30”. Stands feature locking
casters and storage space.
Optional accessory used in a two gas chamber
Optional accessory used in a two gas chamber
Plexiglas Scratch Remover
9990738S
9990738M
9990738L
Sleeves, Complete
Small
Medium
Large
Komentarze do niniejszej Instrukcji