Shellab SHC28R-2 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Shellab SHC28R-2. Shellab SHC28R-2 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 0
HUMIDITY CHAMBER
SHC10 SHC10-2
SHC10R SHC10R-2
SHC28 SHC28-2
SHC28R SHC28R-2
PREVIOUSLY DESIGNATED AS :
HC9 HC9-2/ HC9R HC9R-2
HC30 HC30-2 / HC30R HC30R-2
WITH MICRO PROCESSOR CONTROL
INSTALLATION AND OPERATION INSTRUCTIONS
Revised 01/2014
4861578
Sheldon Manufacturing Inc. P.O. Box 627 Cornelius, Oregon 97113
EMAIL: [email protected] INTERNET: http://www.Shellab.com/~Shellab
1-800-322-4897 (503) 640-3000 FAX (503) 640-1366
Przeglądanie stron 0
1 2 3 4 5 6 ... 26 27

Podsumowanie treści

Strona 1 - SHC28R SHC28R-2

HUMIDITY CHAMBER SHC10 SHC10-2 SHC10R SHC10R-2 SHC28 SHC28-2 SHC28R SHC28R-2 PREVIOUSLY DESIGNATED

Strona 2 - TABLE OF CONTENTS

10 CHART RECORDER INSTALLATION Please note that the following information is a general guide for installation. Before attempting installation pl

Strona 3 - RECEIVING AND INSPECTION

11 MAINTENANCE NOTE: Prior to any maintenance or service on this unit, disconnect power cord from the power supply. Service of any electrical compon

Strona 4 - GRAPHIC SYMBOLS

12 TROUBLESHOOTING Always make a visual inspection of the unit and control console when troubleshooting. Look for loose or disconnecte

Strona 5 - INSTALLATION

13 1/ verify that controller is asking for heat by looking for Heating light – if pilot light is not on continuously, there is a problem with the co

Strona 6

14 1/ assure that exhaust fan is working 2/ assure that exhaust fan blower casing is free of pooled water 3/ check solid state relay 4/ set point ha

Strona 7 - CONTROL OVERVIEW

15 Door not sealing 1/ adjust hinge blocks or twist the door. 2/ Confirm that unit has not been damaged and body is not square. Motor doesn't

Strona 8 - THEORY OF OPERATION

16 PARTS LISTS SHC10 and SHC10-2 (HC9 and HC9-2) SHC10R and SHC10R-2 (HC9R and HC9R-2) DESCRIPTION SHC10 (HC9) 115V SHC10-2 (HC9-2) 220V SHC10R (HC9R

Strona 9 - OPERATION

17 SHC28 (HC30) and SHC28-2 (HC30R) SHC28R (HC30R) and SHC28R-2 (HC30R-2) DESCRIPTION SHC28 (HC30) 115V SHC28-2 (HC30-2) 220V SHC28R (HC30R) 115V SHC

Strona 10 - CHART RECORDER INSTALLATION

18 UNIT SPECIFICATIONS Weight Shipping Net SHC10 SHC10-2 (HC9 HC9-2) 480 lbs. 341 lbs. SHC10R SHC10R-2 (HC9R HC9R-2) 515 lbs. 401 lbs. SHC28 SHC28-2

Strona 11 - MAINTENANCE

RELATIVE HUMIDITY CHART

Strona 12 - TROUBLESHOOTING

2 TABLE OF CONTENTS SECTION 1.0 RECEIVING AND INSPECTION SECTION 2.0 GRAPHIC SYMBOLS SECTION 3.0 INSTALLATION AND FACILITIES REQUIREMENTS SECTION

Strona 13 - HUMIDITY LEVEL

2 WIRING DIAGRAM SHC10 (HC9) (9851449) 1 24FAN1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITEREDBLACKBLOWER MOTOR4880504GREEN L

Strona 14 - REFRIGERATION

3 WIRING DIAGRAM SHC10-2 (HC9-2) (9851450) 1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITEREDBLACKBLOWER MOTOR4880504GREEN LIGH

Strona 15

4 WIRING DIAGRAM SHC10R (HC9R) (9851451) 1 24FAN1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITEREDBLACKBLOWER MOTOR4880504GREEN

Strona 16 - PARTS LISTS

5 WIRING DIAGRAM SHC10R-2 (HC9R-2) (9851452) 2800503EMI FILTER1 24FAN1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITEREDBLACKBLO

Strona 17

6 WIRING DIAGRAM SHC28 (HC30) (9851453) 1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITERED BLACKBLOWER MOTOR4880504GREEN LIGHTE

Strona 18 - UNIT SPECIFICATIONS

7 WIRING DIAGRAM SHC28-2 (HC30-2) (9851454) 1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITEREDBLACKBLOWER MOTOR4880504GREEN LIG

Strona 19 - RELATIVE HUMIDITY CHART

8 WIRING DIAGRAM SHC28R (HC30R) (9851455) 1 24FAN1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITEREDBLACKBLOWER MOTOR4880504GREE

Strona 20 - SHC10 (HC9)

9 WIRING DIAGRAM SHC28R-2 (HC30R-2) (9851456) 2800503EMI FILTER1 24FAN1 2412VDCPOWER SUPPLY 6750507OUTINRH SENSOR41005041 234FANBMBLUEWHITEREDBLACKBL

Strona 21 - SHC10-2 (HC9-2)

3 RECEIVING AND INSPECTION Your satisfaction and safety require a complete understanding of this unit, including its proper function and operational

Strona 22 - WIRING DIAGRAM

4 GRAPHIC SYMBOLS Your incubator has been provided with a display of graphic symbols which is designed to help in identifying the use and function of

Strona 23

5 INSTALLATION Local city, county or other ordinances may govern the use of this equipment. If you have any questions about local requirements,

Strona 24 - (9851453)

6 and assure all volatile or flammable cleaners are evaporated and dry before reattaching the unit to the power supply. 3.6 Humidification Water Sup

Strona 25 - SHC28-2 (HC30-2)

7 CONTROL OVERVIEW 4.1 Power Switch: The main power I/O (On/Off) switch controls all power to the unit, and must be in the I/On position before a

Strona 26 - SHC28R (HC30R)

8 THEORY OF OPERATION These humidity chambers are designed to maintain temperature and relative humidity at set points controllable by the operator

Strona 27 - SHC28R-2 (HC30R-2)

9 OPERATION It is recommended that your unit be allowed to reach operating temperature before engaging the humidifying system. This requires setti

Komentarze do niniejszej Instrukcji

Brak uwag